FAQs Sitemap

Haul Road Dust Control® Case Studies

From a Combative Troubleshooting Situation to Planned Maintenance

Open area construction sites with unpaved roads ways can be the source of dangerous fugitive dust.

Coal Road Dust Control - Opencast Coal Road Dries Out Too Quickly During Hot, Dry Weather

On hot days at a major opencast coal site, the coal roads were drying out and becoming dusty within 20 minutes after watering.